This memorandum also includes a discussion of current and future flood risks to the East Haddam Wastewater Treatment Plant (WWTP) located at 17 Lumber Yard Road, as well as a wastewater pump station located at the intersection of Lumber Yard Road and Dock Road. Both the WWTP and the pump station are susceptible to inundation if a flood event occurs along the Connecticut River. While the WWTP is outside of the Succor Brook floodplain, the area surrounding the pump station is subject to inundation from Succor Brook.
Link: https://resilientconnecticut.media.uconn.edu/wp-content/uploads/sites/3830/2025/07/Resilient-East-Haddam-Appendix-B.pdfTown: East Haddam
Focus Area: Planning
Type: Publications and Reports