Archives

Resilient East Haddam Final Report

Final report and Appendix A for the Resilient Eat Haddam Project. This project assesses flooding risks from Succor Brook and the Connecticut River in the East Haddam village center. Flooding from Succor Brook has affected key areas, including Goodspeed-owned buildings, Norwich Road (Route 82), Creamery Road, and Lumberyard Road. The Connecticut River also poses a […]

Resilient East Haddam Appendix B Flood Model Reference Documents

This memorandum also includes a discussion of current and future flood risks to the East Haddam Wastewater Treatment Plant (WWTP) located at 17 Lumber Yard Road, as well as a wastewater pump station located at the intersection of Lumber Yard Road and Dock Road. Both the WWTP and the pump station are susceptible to inundation […]

Resilient East Haddam Public Workshop 1 Meeting Slides

Powerpoint slides from Public Workshop #1 for the Resilient East Haddam project which is part of Resilient Connecticut program. These slides contain existing and future flood modeling of the Succor Brook corridor which has the potential to impact the residential properties on Creamery Road and facilities associated with the Goodspeed Opera House.